What to check before ordering concrete for a driveway or garden slabs
Getting the basics right before the truck arrives
Ordering concrete for a driveway or a set of garden slabs is not the same as ordering a bag of cement from a builders' merchant. The material arrives ready to place, and once the mixer truck leaves, there is no second chance to adjust the mix. A little planning before the delivery day saves a great deal of stress and waste. This article runs through the main points to think through so the pour goes smoothly and the finished surface lasts.
Check the access for the mixer truck
A standard mixer truck is large, heavy and not especially manoeuvrable. Before you book a delivery, walk the route the truck will take from the road to the discharge point. Look for overhead cables, low tree branches, narrow gateways and tight corners. The truck needs a clear height of around four metres and a width of about two and a half metres. If the driveway has a sharp bend, measure whether a long wheelbase vehicle can negotiate it. If the access is too tight, you may need to specify a smaller truck or arrange a pump to move the concrete from the road to the pour area.
Ground strength matters too. A fully loaded mixer truck weighs around thirty tonnes. If the driveway or the verge at the roadside is soft, the truck could sink or damage the surface. In many domestic jobs the concrete is discharged at the kerb and moved in wheelbarrows. That is a practical solution, but it adds labour and time, so plan for it.
Confirm the delivery window and site readiness
Concrete begins to set from the moment it is mixed. The driver can add a retarder to extend the working time, but even with that, you generally have about two hours from batching to final placement. Agree a precise delivery time with the supplier and make sure the site is fully ready before that time. The sub-base should be compacted, the formwork in place, the reinforcement laid if needed, and all tools on site. Waiting for the truck while you finish digging or levelling puts pressure on the pour and can lead to a poor finish.
If the pour is large, consider splitting it into consecutive loads. The supplier will schedule the trucks so that each load arrives before the previous one stiffens. That sequence needs to be planned in advance, not decided on the day.

Understand the discharge point and how the concrete will reach the pour
The driver will discharge the concrete from the chute at the back of the truck. The chute extends about two metres, so the truck needs to be close to the pour area. If the driveway is long or the garden slabs are at the rear of the property, you will need a pump, a dumper or a wheelbarrow run. Each method has its own preparation. A pump requires a clear hose route and a water supply for cleaning. A wheelbarrow run needs a firm, level path and enough people to keep the barrows moving. Estimate the volume of concrete per barrow and the distance to the pour, then work out how many trips are needed and how many helpers you require.
For garden slabs, the concrete often goes directly into a prepared bed, so the discharge point should be within a few metres of each slab location. If the bed is deep, the concrete can be tipped straight in, which is faster and reduces the risk of segregation.
Check the mix specification for the job
Not all concrete is the same. A driveway needs a mix that can withstand vehicle loads, frost and surface water. A standard C20 or Gen 3 mix is common for domestic driveways, but if you expect heavy traffic or the ground is poor, a stronger C25 or a fibre-reinforced mix may be better. Garden slabs, if they are purely pedestrian, can use a C20 mix. However, if the slabs are large or will carry occasional vehicle weight, check with the supplier which mix they recommend.
Also consider the finish. A tamped or brushed surface needs a mix with a consistent slump, not too wet or it will bleed, not too dry or it will be hard to finish. Tell the supplier what finish you plan so they can adjust the water content or add plasticiser. The phrase "ready mixed concrete for site work" covers a wide range of specifications, and the supplier's technical team can help match the mix to your project. Do not guess; ask.
Plan the pour sequence
A driveway or a slab area is rarely poured in one continuous stream. You need to decide where to start and how to work across the area so that each section is compacted and levelled before the next one arrives. For a driveway, start at the far end and work back towards the truck. That way you never walk on freshly placed concrete, and the last section is closest to the chute, making the final barrow runs short.
For garden slabs, pour the bed for each slab in order, place the slab, tap it level and move on. Work systematically from one side to the other so that you do not trap yourself in a corner. If the slabs are large or the area is big, pour in bays separated by formwork or by the slab edges themselves. That keeps each section manageable and ensures the concrete does not stiffen before you have finished working it.

Factor in time for compaction. A vibrating poker or a tamping beam removes air pockets and settles the concrete around reinforcement. If you skip compaction, the surface may later develop cracks or the slab may have weak spots. Allow at least fifteen to twenty minutes per cubic metre for compacting and levelling, more if the reinforcement is dense.
Prepare the sub-base and formwork
A concrete slab is only as good as what sits beneath it. The ground must be well compacted, free of organic matter and levelled. For a driveway, a sub-base of hardcore or crushed stone, typically one hundred to one hundred and fifty millimetres thick, spreads the load and provides drainage. For garden slabs, a thinner sub-base may suffice, but it still needs to be firm and level.
Formwork holds the concrete in place until it cures. Use timber or metal forms that are straight, well braced and set to the correct height. Check the levels with a spirit level or a laser. If the forms shift during the pour, the finished surface will be uneven. Lubricate the inside of the forms with a light oil so they release cleanly after curing.
Arrange the right tools and labour
On the day of the pour, you need everything at hand before the first load arrives. The basic kit includes shovels, a tamping beam or a straightedge, a vibrating poker if the slab is thick, a float for finishing, and a brush if you want a textured surface. Have a wheelbarrow for moving concrete from the chute to the pour area, and a plank or two for creating a smooth run. A bucket of water and a brush for cleaning tools will also help, though care is needed not to add water to the concrete itself.
Labour is just as important. A single person cannot pour a driveway alone unless it is very small. For a typical domestic driveway, three or four people are ideal: one to direct the chute or manage the pump hose, one to barrow, one to spread and tamp, and one to handle the finishing. For garden slabs, two people can manage if the slabs are small and the site is close to the discharge point.
Think about the weather and curing
Concrete reacts to temperature. In hot weather, water evaporates quickly and the surface may dry and crack before it has gained strength. In cold weather, the hydration reaction slows or stops, and the concrete may freeze before it sets. The ideal temperature range for placing concrete is between five and thirty degrees Celsius. If the forecast is outside that range, talk to the supplier about using an accelerator or a retarder, and plan to cover the pour with insulating blankets or polythene sheeting.

Curing is the period during which the concrete gains its strength. Keep the surface damp for at least seven days, longer if the slab is structural. Spray it with water, cover it with wet hessian or use a curing compound. A driveway or slab that cures properly will be more durable and less likely to crack.
When you order your next load, remember that the quality of the pour depends as much on preparation as on the material itself. The phrase "ready mixed concrete for site work" is what the supplier delivers, but the site work is your responsibility. Check every point on this list, and the concrete will do its job for years.